An erratum was issued for: Optimizing and Evaluating Hand-drawing and Wet-spinning for Recombinant Spider Silk Fiber Production. The Protocol section was updated.
2025년 9월 8일
An erratum was issued for: Optimizing and Evaluating Hand-drawing and Wet-spinning for Recombinant Spider Silk Fiber Production. The Protocol section was updated.
This corrects the article 10.3791/68714
An erratum was issued for: Optimizing and Evaluating Hand-drawing and Wet-spinning for Recombinant Spider Silk Fiber Production. The Protocol section was updated. Figure 1 was updated to:

Figure 1: Schematic overview of key steps in the protocol for recombinant spider silk protein fiber production, collection, and characterization. Please click here to view a larger version of this figure.
이 JoVE 논문의 텍스트 또는 그림 재사용 허가 요청
허가 요청